RD-063 Kathleen Boulevard & Canal Road Paving Improvements Project RFP
Project involves the removal and replacement of existing asphalt pavement with 6-inch thick concrete pavement. Roadway excavation (18" depth), including removal of existing asphalt pavement and base material, complete in place, the sum of: CY 2,440; reinforced concrete pavement (6"), complete in place, the sum of: SY 4,470; concrete pavement headers at existing asphalt pavement, complete in place, the sum of: LF 2; type i thermoplastic pavement marking (12") white, including surface preparation and sealer, complete in place, the sum of: LF 83.