Closed

Cowan Lake State Park Gutter Installation on Eight (8) Buildings (Request for Quote)

Description: Work includes gutter installation on eight (8) buildings. Remove and dispose of all existing gutters and downspouts. Install new gutters on two sides of the building (approx. 44 ft; contractor to verify). Install four downspouts total, one at each corner. Ensure all downspouts are angled to divert water away from the building foundation. Inspect areas where gutters were torn off due to campers scraping the building. Install new facia trim. Replace existing gutter in brown color, to be approved by park manager prior to installation, on front of building with down spout.

Released
Jul 28, 2026
Closes
Aug 18, 2026(Closed)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts