Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project constructs up to 6872 LF of off-road, bike optimized, single track trail in country grove park and adjacent greenways.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Project consists of the construction of new trail connectors and drainage repairs to existing trail elements. The Douglas Loop Trail Improvements project entails expansion of the paving to fill gaps in the existing walking trail. Additionally, enhancements such as bollards, restriping, benches, ADA ramps, crosswalks, speed humps, new plantings, and a water fountain are planned.
Posted Date
Dec 17, 2025
Due Date
Jan 29, 2026
Release: Dec 17, 2025
Close: Jan 29, 2026
The Project consists of the construction of new trail connectors and drainage repairs to existing trail elements. The Douglas Loop Trail Improvements project entails expansion of the paving to fill gaps in the existing walking trail. Additionally, enhancements such as bollards, restriping, benches, ADA ramps, crosswalks, speed humps, new plantings, and a water fountain are planned.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work shall consist essentially of the following items: replacement of trail bridge decking and railing and repairs to failed substructure elements as directed.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
The work shall consist essentially of the following items: replacement of trail bridge decking and railing and repairs to failed substructure elements as directed.
AvailableProvide Brickell and Coconut Grove Seawall Improvements.
Posted Date
Dec 21, 2025
Due Date
Jan 30, 2026
Release: Dec 21, 2025
Close: Jan 30, 2026
Provide Brickell and Coconut Grove Seawall Improvements.
AvailableThe City of Jonesboro is soliciting bids for trail improvements at Craighead Forest Park, including stabilizing and constructing 8,899 linear feet of soft‑surface trail and installing 5,272 square feet of revetment mat. The trail will utilize three different cross sections as shown in the project details at 411 E Craighead Forest Road. Bids are due February 18, 2026 at 2:00 PM Central, and an advertisement is available with specifications obtainable for a fee.
Posted Date
Jan 23, 2026
Due Date
Feb 18, 2026
Release: Jan 23, 2026
Close: Feb 18, 2026
The City of Jonesboro is soliciting bids for trail improvements at Craighead Forest Park, including stabilizing and constructing 8,899 linear feet of soft‑surface trail and installing 5,272 square feet of revetment mat. The trail will utilize three different cross sections as shown in the project details at 411 E Craighead Forest Road. Bids are due February 18, 2026 at 2:00 PM Central, and an advertisement is available with specifications obtainable for a fee.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →