CityCA
Jul 14, 2026
Closes
Sep 18, 2026
Roach Control and Treatment (RPF)
Perform roach control and treatment by applying a usepa-approved insecticidal latex coating to the inside of maintenance holes up to a depth of eight (8) feet.
Description: The U.S. Naval Research Laboratory is soliciting a contractor to perform corrosion-control and coating services for one AN/FSC-78 terminal in Guam. The work includes cleaning contaminated antenna surfaces, removing loose coating and superficial corrosion, preparing surfaces, applying compatible protective coatings, and disposing of coating debris in compliance with applicable federal, Department of Defense, Navy, Guam, environmental, safety, and hazardous-material requirements. The solicitation is a procurement for services, is open as of 2026-07-25, and requires all necessary labor, materials, equipment, and quality-control measures.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
CityCA
Jul 14, 2026
Closes
Sep 18, 2026
Perform roach control and treatment by applying a usepa-approved insecticidal latex coating to the inside of maintenance holes up to a depth of eight (8) feet.
CityFL
Jul 28, 2026
Closes
Aug 25, 2026
The City of Deerfield Beach is soliciting sealed electronic bids for the rehabilitation and restoration of the 3-MGD RO Plant Degasifier Tower and Odor Control Scrubber System at its Water Treatment Plant. The work includes removal and disposal of existing media, cleaning and inspection, structural grating and minor repairs, interior coating, installation of owner-supplied media, and performance testing. Bidders must hold a valid Florida Certified or Registered General Contractor license, submit a five-percent bid guaranty, and may attend the non-mandatory pre-bid conference on August 5, 2026.
CountyFL
May 13, 2026
Closes
Aug 5, 2026
Work includes force main connection for bypass pumping, bypass pumping, dewatering, draining and cleaning wet wells, wet well coating removal, wet well coating/liner replacement, reconstruction of wet well fillet, wet well top replacement, pump/piping replacement, arv replacement, electrical work, i&c work, general restoration, concrete work, erosion control, confined space work , pump piping work.
CityGA
-
Closes
Jul 30, 2026
Lift station rehabilitation, bypass pumping of sanitary sewer, demolition of existing pump station, rehabilitation of existing wet well, pump installation, valve vault installation, control panel installation, pipe preparation and coating, bypass connection, concrete, soil erosion and sediment control, construction exit, electrical, mechanical, and other appurtenances necessary to provide complete and working installation.