CityCA
Posted
Jul 11, 2026
Nov 10, 2026
Corpyard Phase II - Connex Structural Anchoring & Welding *RE-BID*
Work includes 56 EA anchoring: drilling & checmical epoxy setting per drawings; 56 EA structural base plates(astm a36 steel angles/plates); 56 EA metal fabrication & aws welding(secure plates to conex corner castings); 14 EA rust mitigation & coating (zinc-rich cold galvanizing spray) and cleanup; 1 LS special inspection and testing, and closeout.
