Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
3,565 CY, excavation - ghannel and pond (LV); 1,730 CY, excavation - channel and pond (LV} (Special 1); 1,440 ton, excavation - channel and pond (LV) (Special 2); 130 LF, 18" RC pipe sewer clv; 1 ea, const drainage structure design special 1; 4 LF, const drainage structure des 48-4020.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pond maintenance for 5 Village ponds. Contract period beginning approx. April 1st, 2026 up to November 1st, 2026. Contract may be extended for not more than two (2) additional periods under the same terms and conditions.
Posted Date
Jan 2, 2026
Due Date
Feb 6, 2026
Release: Jan 2, 2026
Close: Feb 6, 2026
Pond maintenance for 5 Village ponds. Contract period beginning approx. April 1st, 2026 up to November 1st, 2026. Contract may be extended for not more than two (2) additional periods under the same terms and conditions.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project generally consists of construction work at three ponds. Work at each pond is summarized as follows: burland pond 1: construction of a new combined low-level outlet works and service spillway structure, and construction of a new emergency spillway channel. The project also includes a raise of the existing dam embankment, and construction of a new dry hydrant. Burland pond 2: construction of a new low-level outlet works, and construction of a new emergency spillway training berm. The project also includes construction of a new toe drain system, and construction of a new dry hydrant. Burland pond 3: construction of a new combined low-level outlet works and service spillway structure, and enlargement of the existing emergency spillway channel. The project also includes a raise of the existing dam embankment, construction of new downstream slope erosion protection, and construction of a new dry hydrant.
Posted Date
Dec 26, 2025
Due Date
Feb 27, 2026
Release: Dec 26, 2025
Close: Feb 27, 2026
The project generally consists of construction work at three ponds. Work at each pond is summarized as follows: burland pond 1: construction of a new combined low-level outlet works and service spillway structure, and construction of a new emergency spillway channel. The project also includes a raise of the existing dam embankment, and construction of a new dry hydrant. Burland pond 2: construction of a new low-level outlet works, and construction of a new emergency spillway training berm. The project also includes construction of a new toe drain system, and construction of a new dry hydrant. Burland pond 3: construction of a new combined low-level outlet works and service spillway structure, and enlargement of the existing emergency spillway channel. The project also includes a raise of the existing dam embankment, construction of new downstream slope erosion protection, and construction of a new dry hydrant.
AvailableThe Desoto County School District is soliciting sealed bids for the Lake Cormorant High School HVAC Replacement project. The work includes replacing existing HVAC units serving the main office and counselor offices and all associated electrical and plumbing. Official documents are available through Central Bidding, and plans/specifications are available via the Allen & Hoshall planroom; bids are due February 18, 2026 at 2:00 p.m. local time.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
The Desoto County School District is soliciting sealed bids for the Lake Cormorant High School HVAC Replacement project. The work includes replacing existing HVAC units serving the main office and counselor offices and all associated electrical and plumbing. Official documents are available through Central Bidding, and plans/specifications are available via the Allen & Hoshall planroom; bids are due February 18, 2026 at 2:00 p.m. local time.
AvailableWork consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
Posted Date
Sep 20, 2022
Due Date
Oct 11, 2027
Release: Sep 20, 2022
Close: Oct 11, 2027
Work consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →