Metropolitan Water Dist Of Southern California
Special DistrictCA
Aug 11, 2026
Closes
Sep 22, 2026
Copper Basin Reservoir Discharge Valve Replacement 1947
The Metropolitan Water District of Southern California is soliciting electronic bids for the Copper Basin Reservoir Discharge Valve Replacement project, with an estimated bid value of $17,000,000 to $21,000,000. The work includes removing and replacing the discharge valve and actuator, recoating the pipeline interior, refurbishing the valve house and slide gate valve, upgrading electrical and telecommunications systems, installing a temporary underwater isolation device, and improving the access road. This is an active construction bid rather than a grant program, with a mandatory pre-bid meeting, Project Labor Agreement requirements, and bids due September 22, 2026 at 2:00 PM PDT.