StateWI
Aug 7, 2026
Closes
Sep 8, 2026
ControlNet Upgrades
ControlNet Upgrades calls for removing the existing ControlNet PLC network and associated switches and installing a new CAT-6E-based redundant-ring backbone and star-drops PLC network for the CHPP (Capitol Heat and Power Plant) project. The posting is an electrical-contractor solicitation (NAICS 238210) for the State Government of Wisconsin, not a grant program. The source lists publication as 08/07/2026 04:13 PM EDT and closing as 09/08/2026 03:00 PM EDT, so it remained open on 2026-08-08.