CityOH
Jul 20, 2026
Closes
Aug 12, 2026
North Garfield Street Waterline Replacement
Work includes : 2,398 SF walk removed; 1,885 CY excavation including embankment construction, as per plan; 3,863 SY pavement planing, asphalt concrete (1-1/2"± thick); 1,874 SF 4" concrete walk, as per plan; 7 EA manhole adjusted to grade; 5 EA 8" gate valve; 3 EA fire hydrant removed; see outside link.