Higher EducationFL
Posted
-
Oct 30, 2026
UCF-614 Water Treatment Plant, Construction & Testing of Two Upper Floridan Aquifer Production Wells RFP
Construction and testing of two 16-inch diameter Upper Floridan Aquifer public water supply wells, including drilling, casing, grouting, development, capacity testing, geophysical and video logging, water standards analysis, disinfection, and potential well stimulation.