Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes the complete installation of approximately 900 linear feet of 1. 5 and 2 inch diameter HDPE low pressure sanitary sewer force main, 10 1. 25 inch diameter HDPE service laterals and individual curb box assemblies, and all temporary and permanent surface restoration including lawn, bituminous roadway, and driveway.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement for the installation of a sewer lift station and sewer force main.
Posted Date
Jan 4, 2026
Due Date
Feb 6, 2026
Release: Jan 4, 2026
Close: Feb 6, 2026
Procurement for the installation of a sewer lift station and sewer force main.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Work includes : demolition and removal of 1 existing wastewater ejector pump station, installation of 1 wastewater submersible pump station and valve vault, installation of approx. 670 LF of 4" HDPE DR 17 sewer force main, and other related tasks.
AvailableThe work consist of 360 LF 12" PVC force main; 500 LF 10" PVC force main; 40 LF 12" ductile iron within casing; 3 EA combination air release valve.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
The work consist of 360 LF 12" PVC force main; 500 LF 10" PVC force main; 40 LF 12" ductile iron within casing; 3 EA combination air release valve.
AvailableThe project consists of the rehabilitation of a portion of the liverpool force main. The 18-inch pccp liverpool force main is to be rehabilitated using a flexible fabric reinforced pipe. The project also includes the replacement of valve vaults and access and air valve manholes.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
The project consists of the rehabilitation of a portion of the liverpool force main. The 18-inch pccp liverpool force main is to be rehabilitated using a flexible fabric reinforced pipe. The project also includes the replacement of valve vaults and access and air valve manholes.