Work includes 1 LS site a - install launch assembly. Install pig-launcher assembly, including, but not limited to demolition, pipes, fittings, couplings, valves and materials, bollards, valve box, linestop with temporary bypass piping, thrust restraints, water from ebmud hydrant, test station, site clearing, storm water pollution prevention measures, temporary support of existing utilities, excavation, sheeting and shoring, bedding, backfill, compaction, removal and disposal of trench spoils, old pipe and structures, surface restoration, cleanup, testing, asphalt concrete paving, temporary fencing, site security, lighting, and contractor support during ili inspection. See attached file.
Available