Summary
Replacement of multiple sections of the commercial street forcemain, connection to the existing commercial street forcemain and front street forcemain, new water and electrical services. Approx 3,770 LF of 24" HDPE Force Main Pipe; 20 LF of 4" Ductile Iron Force Main Pipe; 50 LF of 16" Ductile Iron Force Main Pipe; 25 LF of 24" Ductile Iron Force Main Pipe; 10 VF of 6' Diameter Sewer Manholes; 550 LF of Pipe Trench Insulation; 1,100 CY of Trench Excavation - Ledge; 100 Cy of Excavation Below Grade and Replacement Backfill; 20 Tons of Sidewalk Pavement; 75 Tons of Parking Lot Pavement; 100 CY of Concrete Sidewalk; 900 SY of Brick Sidewalk Remove/Reset.