CountyMD
Posted
May 13, 2026
Oct 7, 2026
Hammond Avenue - Storm Drainage Pipe Replacement
Storm drainage pipe replacement.
Description: The City of Maple Ridge requests proposals from experienced and qualified firms for consulting services. The work covers design, contract administration, and construction inspection for a replacement drainage system along Ferguson Avenue from 112 Ave to the storm-water outfall at the 26400 block in Maple Ridge, British Columbia. The successful proponent must evaluate and recommend alternatives such as an open ditch, closed system, or flow-split approach, with the replacement meeting current and future capacity requirements.
City · BC, CA
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Maple Ridge.
Adjacent opportunities open for bidding right now.
CountyMD
Posted
May 13, 2026
Oct 7, 2026
Storm drainage pipe replacement.
CityGA
Posted
Aug 27, 2026
Oct 22, 2026
Drainage improvement work consists of the following: Stormwater drainage improvements along Lakeland Avenue including curb and gutter, storm pipes and sidewalk, Dredging of the existing channel of One Mile Branch, Construction of a 1.25-acre regional stormwater pond to the west of One Mile Branch, Construction of a 0.5-acre stormwater pond behind the Senior Center.
CityBC
Posted
-
Sep 23, 2026
The City of Surrey's Invitation to Tender seeks construction of a new 60th Avenue pump station at the point where the 60th Avenue corridor intersects the Serpentine River. The work includes a precast concrete pump chamber with one new pump, site preparation, new access roads, foundation works, an elevated electrical building, discharge piping, and upgrades to the agricultural ditches. The City lists the solicitation as open and says it is issued electronically through BC Bid, with bids closing September 23, 2026 at 2:00pm local time.
CountyGA
Posted
-
Sep 24, 2026
Construction and installation of an upgraded traffic signal, turn lanes, sidewalks and drainage improvements. 759 GL tack coat, 6,679 SY mill asphalt concrete pavement, 1,560 LF 18" storm drain pipe, 429 LF video inspection, 1 EA manhole adjustment, 4 EA storm sewer manhole, erosion control, permanent grassing, fertilizer, 51 SF highway signs, 235 LF 4" directional bore, 53 CY retaining wall.