Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of roadways.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Dresurfacing east grafton rd east grafton rd.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Dresurfacing east grafton rd east grafton rd.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Providing grinding a layer of existing pavement, 1" asphalt concrete leveling course over prime coat, a Geosynthetic pavement interlayer, top with a 2" of asphalt concrete overlay, header cut grinding, striping and signage, shoulder backing with Class II aggregate base, construction area signage.
Posted Date
Nov 25, 2025
Due Date
Jan 9, 2026
Release: Nov 25, 2025
Close: Jan 9, 2026
Providing grinding a layer of existing pavement, 1" asphalt concrete leveling course over prime coat, a Geosynthetic pavement interlayer, top with a 2" of asphalt concrete overlay, header cut grinding, striping and signage, shoulder backing with Class II aggregate base, construction area signage.
AvailableProvide Resurfacing Roots Run Rd- North Mtn.
Posted Date
Dec 23, 2025
Due Date
Jan 13, 2026
Release: Dec 23, 2025
Close: Jan 13, 2026
Provide Resurfacing Roots Run Rd- North Mtn.
AvailableWork includes: removal of existing traffic signal equipment; installation and upgrade of new traffic signal equipment; modifications to signal hardware and control systems; testing, calibration, and commissioning to ensure proper operation; compliance with all bid documents, plans, specifications, and standard provisions; and coordination to complete all required signal upgrades and modifications.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Work includes: removal of existing traffic signal equipment; installation and upgrade of new traffic signal equipment; modifications to signal hardware and control systems; testing, calibration, and commissioning to ensure proper operation; compliance with all bid documents, plans, specifications, and standard provisions; and coordination to complete all required signal upgrades and modifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →