Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Providing grinding a layer of existing pavement, 1" asphalt concrete leveling course over prime coat, a Geosynthetic pavement interlayer, top with a 2" of asphalt concrete overlay, header cut grinding, striping and signage, shoulder backing with Class II aggregate base, construction area signage.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of labor and materials for the construction of Andry Rd, Henry Andry Rd, Frank Taylor Rd, and Cedar Creek Baptist Church Rd.
Posted Date
Dec 31, 2025
Due Date
Jan 28, 2026
Release: Dec 31, 2025
Close: Jan 28, 2026
Procurement of labor and materials for the construction of Andry Rd, Henry Andry Rd, Frank Taylor Rd, and Cedar Creek Baptist Church Rd.
AvailableDresurfacing east grafton rd east grafton rd.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Dresurfacing east grafton rd east grafton rd.
AvailableWork consists of approx. the services of a consulting engineering firm to provide the design of construction ready plan sets for the rehabilitation/replacement of a 12x10 reinforced concrete box culvert under Murray Rd. and any/all required/associated hydraulic analysis/design necessary to achieve no rise certifications for both upstream and downstream conditions.
Posted Date
Dec 19, 2025
Due Date
Jan 30, 2026
Release: Dec 19, 2025
Close: Jan 30, 2026
Work consists of approx. the services of a consulting engineering firm to provide the design of construction ready plan sets for the rehabilitation/replacement of a 12x10 reinforced concrete box culvert under Murray Rd. and any/all required/associated hydraulic analysis/design necessary to achieve no rise certifications for both upstream and downstream conditions.
Construction of roadway. Work includes PCC roadway paving, PCC trail, grading, subgrade treatment, storm sewer, water main, pavement marking and signing, PCC pavers, traffic control, plantings, lighting, and site restoration.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Construction of roadway. Work includes PCC roadway paving, PCC trail, grading, subgrade treatment, storm sewer, water main, pavement marking and signing, PCC pavers, traffic control, plantings, lighting, and site restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis