Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of roadway. Work includes PCC roadway paving, PCC trail, grading, subgrade treatment, storm sewer, water main, pavement marking and signing, PCC pavers, traffic control, plantings, lighting, and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This active government solicitation, titled "131st Ave Infrastructure Improvements," is issued by the City of Lake Stevens. It involves roadway and sewer infrastructure work, including sanitary sewer main replacement/installation, stormwater management, and the creation of a multi-use path. The project aims to enhance traffic flow and environmental controls along 131st Avenue.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
This active government solicitation, titled "131st Ave Infrastructure Improvements," is issued by the City of Lake Stevens. It involves roadway and sewer infrastructure work, including sanitary sewer main replacement/installation, stormwater management, and the creation of a multi-use path. The project aims to enhance traffic flow and environmental controls along 131st Avenue.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
The City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
AvailableThe City of Santa Rosa (CA) issued an IFB for the Hopper Ave Corridor Fire Recovery Improvements Project to rehabilitate roadway and utilities along Hopper Ave between Coffey Ln and Airway Dr following damage from the 2017 Tubbs Fire. The scope includes replacement and realignment of approximately 1,155 linear feet of sewer main and 167 linear feet of water main, plus roadway restoration and minor water/sewer improvements. The solicitation was posted Jan 7, 2026 and bids are due Jan 27, 2026.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Close: Jan 27, 2026
The City of Santa Rosa (CA) issued an IFB for the Hopper Ave Corridor Fire Recovery Improvements Project to rehabilitate roadway and utilities along Hopper Ave between Coffey Ln and Airway Dr following damage from the 2017 Tubbs Fire. The scope includes replacement and realignment of approximately 1,155 linear feet of sewer main and 167 linear feet of water main, plus roadway restoration and minor water/sewer improvements. The solicitation was posted Jan 7, 2026 and bids are due Jan 27, 2026.
AvailableThe Construction of the City - Road Intersection Improvements will be received by City.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
The Construction of the City - Road Intersection Improvements will be received by City.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →