Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Install furnishing and installing a submersible well pump, motor, column pipe, discharge head, electrical equipment, controls and associated raw water main, valves, and fittings, and buried fiber optic cable.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The work includes; construction of two (2) 5" dia test-observation wells, construction and aquifer testing of a type i community water supply well known as test-production well no. 8.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
The work includes; construction of two (2) 5" dia test-observation wells, construction and aquifer testing of a type i community water supply well known as test-production well no. 8.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide all necessary labor, equipment, parts and supplies to: Demolition / Decommission: Decommission old well as required by Maryland state regulations, to include filling of old well with dry bentonite and properly cap or seals as per local state requirements. Prepare Water Well Abandonment-Sealing Report. Remove existing pump, pressure tanks, associated pipe connection and any device related to the existing well operation. Properly dispose any material. Remove electrical connection back to point of connection. Existing well cannot be demolish and disconnected from the water distribution system until the new well is ready to be connected to the existing water distribution. See attached file.
Posted Date
Oct 30, 2025
Due Date
Jan 21, 2026
Release: Oct 30, 2025
Close: Jan 21, 2026
Provide all necessary labor, equipment, parts and supplies to: Demolition / Decommission: Decommission old well as required by Maryland state regulations, to include filling of old well with dry bentonite and properly cap or seals as per local state requirements. Prepare Water Well Abandonment-Sealing Report. Remove existing pump, pressure tanks, associated pipe connection and any device related to the existing well operation. Properly dispose any material. Remove electrical connection back to point of connection. Existing well cannot be demolish and disconnected from the water distribution system until the new well is ready to be connected to the existing water distribution. See attached file.
AvailableProcurement of a contractor for the construction of a new water production well.
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Close: Jan 22, 2026
Procurement of a contractor for the construction of a new water production well.
AvailableRFP for Ground Water Production Well SM-14 drilling services.
Posted Date
Nov 25, 2025
Due Date
Dec 31, 2099
Release: Nov 25, 2025
Close: Dec 31, 2099
RFP for Ground Water Production Well SM-14 drilling services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →