Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes; construction of two (2) 5" dia test-observation wells, construction and aquifer testing of a type i community water supply well known as test-production well no. 8.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide test hole drilling, zone testing & production well construction. 1 LS test hole mobilization and demobilization; 1 LS clearing and grubbing and site work; 50 LF conductor casing; 100' bentonite grout and concrete; 1 LS drilling fluid and handling facilities; 8 EA bentonite seals; 750 LF test hole drilling; 1 LS downhole geophysical and mechanical surveys; 4 EA zone testing; 1 LS construction water piping; 400 LF temporary modular sound barriers; 1 LS test hole destruction; 1 LS production well mobilization and demobilization; 750 LF ream test hole to final diameter; 1 LS reamed test hole mechanical logging; 585 LF F&I lcs permanent 3" Φ gravel fill tube; 550 LF F&I permanent 2' sounding tube; 230 LF f&i 8x12 sri annular filter- pack. See attached file.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 22, 2026
Provide test hole drilling, zone testing & production well construction. 1 LS test hole mobilization and demobilization; 1 LS clearing and grubbing and site work; 50 LF conductor casing; 100' bentonite grout and concrete; 1 LS drilling fluid and handling facilities; 8 EA bentonite seals; 750 LF test hole drilling; 1 LS downhole geophysical and mechanical surveys; 4 EA zone testing; 1 LS construction water piping; 400 LF temporary modular sound barriers; 1 LS test hole destruction; 1 LS production well mobilization and demobilization; 750 LF ream test hole to final diameter; 1 LS reamed test hole mechanical logging; 585 LF F&I lcs permanent 3" Φ gravel fill tube; 550 LF F&I permanent 2' sounding tube; 230 LF f&i 8x12 sri annular filter- pack. See attached file.
AvailableWork includes test hole drilling and zone testing utilizing the reverse circulation drilling method, well destruction, production well construction. Work also includes 750 LF of test hole drilling; 750 LF of ream test hole to final diameter; 550 LF of f&i permanent 2" sounding tube; 230 LF of f&i 8x12 sri annular filter-pack; 560 LF of f&i concrete annular seals; 10 LF of bentonite annular seal. See outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Work includes test hole drilling and zone testing utilizing the reverse circulation drilling method, well destruction, production well construction. Work also includes 750 LF of test hole drilling; 750 LF of ream test hole to final diameter; 550 LF of f&i permanent 2" sounding tube; 230 LF of f&i 8x12 sri annular filter-pack; 560 LF of f&i concrete annular seals; 10 LF of bentonite annular seal. See outside link.
AvailableInstall furnishing and installing a submersible well pump, motor, column pipe, discharge head, electrical equipment, controls and associated raw water main, valves, and fittings, and buried fiber optic cable.
Posted Date
Dec 31, 2025
Due Date
Feb 4, 2026
Release: Dec 31, 2025
Close: Feb 4, 2026
Install furnishing and installing a submersible well pump, motor, column pipe, discharge head, electrical equipment, controls and associated raw water main, valves, and fittings, and buried fiber optic cable.
AvailableThe Project includes the following Work: Construction, pump testing, and capping of the test well.
Posted Date
Jan 7, 2026
Due Date
Jan 22, 2026
Release: Jan 7, 2026
Close: Jan 22, 2026
The Project includes the following Work: Construction, pump testing, and capping of the test well.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →