Retrieving RFP details
Release
Close
Nail Swain Water Association
Provide construction of tank no. 2 - 105,000 gallon standpipe rehabilitation. The project consists of the following: sandblast and paint interior and exterior of existing 105,000 gallon standpipe; surface repairs to concrete base; furnish and install a passive mixing system on pipe inlet; new float and flag system on tank; overflow pipe extension with splash pad installation; sampling and sanitation station improvements.
Nail Swain Water Association
Sandblast and paint interior and exterior of existing 175,000 gallon standpipe. Surface repairs to concrete base. Furnish and install a passive mixing system on pipe inlet. SCADA and flow control wiring improvements. Overflow pipe replacement with splash pad and rip rap installation. Sampling and sanitation station installation. Roof vent replacement. Fill level indicator repair.
Nail Swain Water Association
Sandblast and paint interior and exterior of existing 105,000 gallon standpipe. Surface repairs to concrete base. Furnish and install a passive mixing system on pipe inlet. New float and flag system on tank. Overflow pipe extension with splash pad installation. Sampling and sanitation station improvements.
Newton County
The project consists of the following: Sandblast and paint interior and exterior of existing 105,000 Gallon standpipe. Surface repairs to concrete base. Furnish and install a passive mixing system on pipe inlet. New float and flag system on tank. Overflow pipe extension with splash pad installation. Sampling and sanitation station improvements.
Release
Nov 02, 2025
Close
Nov 21, 2025