Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Nail Swain Water Association
Provide construction of tank no. 2 - 105,000 gallon standpipe rehabilitation. The project consists of the following: sandblast and paint interior and exterior of existing 105,000 gallon standpipe; surface repairs to concrete base; furnish and install a passive mixing system on pipe inlet; new float and flag system on tank; overflow pipe extension with splash pad installation; sampling and sanitation station improvements.
Posted Date
Nov 2, 2025
Due Date
Nov 21, 2025
Release: Nov 2, 2025
Nail Swain Water Association
Close: Nov 21, 2025
Provide construction of tank no. 2 - 105,000 gallon standpipe rehabilitation. The project consists of the following: sandblast and paint interior and exterior of existing 105,000 gallon standpipe; surface repairs to concrete base; furnish and install a passive mixing system on pipe inlet; new float and flag system on tank; overflow pipe extension with splash pad installation; sampling and sanitation station improvements.
Nail Swain Water Association
Sandblast and paint interior and exterior of existing 175,000 gallon standpipe. Surface repairs to concrete base. Furnish and install a passive mixing system on pipe inlet. SCADA and flow control wiring improvements. Overflow pipe replacement with splash pad and rip rap installation. Sampling and sanitation station installation. Roof vent replacement. Fill level indicator repair.
Posted Date
Oct 27, 2025
Due Date
Nov 21, 2025
Release: Oct 27, 2025
Nail Swain Water Association
Close: Nov 21, 2025
Sandblast and paint interior and exterior of existing 175,000 gallon standpipe. Surface repairs to concrete base. Furnish and install a passive mixing system on pipe inlet. SCADA and flow control wiring improvements. Overflow pipe replacement with splash pad and rip rap installation. Sampling and sanitation station installation. Roof vent replacement. Fill level indicator repair.
Nail Swain Water Association
Sandblast and paint interior and exterior of existing 105,000 gallon standpipe. Surface repairs to concrete base. Furnish and install a passive mixing system on pipe inlet. New float and flag system on tank. Overflow pipe extension with splash pad installation. Sampling and sanitation station improvements.
Posted Date
Oct 27, 2025
Due Date
Nov 21, 2025
Release: Oct 27, 2025
Nail Swain Water Association
Close: Nov 21, 2025
Sandblast and paint interior and exterior of existing 105,000 gallon standpipe. Surface repairs to concrete base. Furnish and install a passive mixing system on pipe inlet. New float and flag system on tank. Overflow pipe extension with splash pad installation. Sampling and sanitation station improvements.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Nail Swain Water Association's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database