Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consist of constructing a single story, 1,850 SF framed building. Work involves the structure, site work and utilities.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
DESIGN-BUILD: Shipping and Receiving Building. Construct a Shipping and Receiving Building. Primary facilities include the shipping and receiving facility with high bay warehouse space, administrative space, and loading dock, and organizational vehicle parking. Project includes building information systems, antiterrorism/force protection measure, fire protection and alarm systems, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include utility (electric, water, sewer, and gas) connections, exterior lighting, paving, parking, storm drainage, landscaping, site improvements, and information systems. Post Construction Award Services (PCAS) will be included in the project. Heating and air conditioning will be provided by self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings-related interior design services are required. Access for individuals with disabilities will be provided. Cybersecurity Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 40 Tons).
Posted Date
Oct 27, 2025
Due Date
Nov 11, 2029
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Oct 27, 2025
Close: Nov 11, 2029
DESIGN-BUILD: Shipping and Receiving Building. Construct a Shipping and Receiving Building. Primary facilities include the shipping and receiving facility with high bay warehouse space, administrative space, and loading dock, and organizational vehicle parking. Project includes building information systems, antiterrorism/force protection measure, fire protection and alarm systems, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include utility (electric, water, sewer, and gas) connections, exterior lighting, paving, parking, storm drainage, landscaping, site improvements, and information systems. Post Construction Award Services (PCAS) will be included in the project. Heating and air conditioning will be provided by self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings-related interior design services are required. Access for individuals with disabilities will be provided. Cybersecurity Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 40 Tons).
AvailableConstruction of a new town hall building and septic.
Posted Date
Dec 3, 2025
Due Date
Jan 13, 2026
Release: Dec 3, 2025
Close: Jan 13, 2026
Construction of a new town hall building and septic.
AvailableNew Construction of the Branch Library Building.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
New Construction of the Branch Library Building.
AvailablePerform general construction work for the construction of new buildings.
Posted Date
Feb 12, 2024
Due Date
Dec 31, 2099
Release: Feb 12, 2024
Close: Dec 31, 2099
Perform general construction work for the construction of new buildings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →