CityIL
Posted
-
Nov 6, 2026
055-85784 - Construction of a PCC Shared-use path along 25th Avenue
Work includes approx 52 CY removal and disposal of unsuitable material: 126 CY furnished excavation: 306 SY geotechnical fabric for ground stabilization: 3,483 SY sodding, salt tolerant. See outside link.
