Retrieving RFP details
Release
Close
City of Crestview
Project consists of approx 413 TN of asphalt pavemnet; 940 SY of base; 387 LF pipe (storm); 1552 LF curb & 4 inlets.
Addendum 1 - Redstone Phase 2 26-11-20-PMO_PreBid Agenda and Sign In sheet
Manatee County
Qualified firms for the provision of construction phase geotechnical engineering, soils & materials testing. Consultant shall provide all labor (note: the county does not pay overtime), materials, equipment, supplies and travel to perform the construction phase geotechnical engineering services to include: 1. Soils testing; 2. Materials testing; 3. Hydrological testing; 4. Asphalt paving reports; 5. Drill shaft testing; 6. Field sampling and testing; 7. Laboratory testing; 8. Geotechnical engineering services; 9. Perform all the services in accordance with generally accepted geotechnical engineering professional standards.
City of Bonney Lake
Replacement of approx. 203 LF of 8" PVC sewer main on 77th Street Court East, reconnecting of side sewers, water service replacement and hot mix asphalt surface restoration; as well as repairs of a damaged 8" PVC sewer main on 205th Avenue by replacing approx. 14 LF of the sewer main and reconnecting a 6" sewer side service.
Surgoinsville Utility District
Construction of pump station.
Release
Oct 14, 2025
Close
Nov 20, 2025