Description: This project involves bridge widening and approach roadway construction, including staged removal of existing bridge portions, new bridge widening construction, and associated infrastructure work.
City · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to City of Redding.
Adjacent opportunities open for bidding right now.
CityCA
Jul 30, 2026
Closes
Sep 8, 2026
The City of Colton is soliciting construction management services for the Mt Vernon Avenue Over-UPRR Bridge Widening project. The City's official procurement instructions direct formal bids to BidNet's Online Bid System Network, and the specific detail page does not expose a fuller scope or public primary bid document. The posting shows a publication date of 07/30/2026 and a closing date of 09/08/2026 at 04:00 PM PDT, and it is a services solicitation rather than a grant-program notice.
Kentucky Transportation Cabinet
State AgencyKY
-
Closes
Aug 10, 2026
Louisville Metro Government, through its Department of Public Works, issued Invitation for Bid (IFB 260043) for the River Road Widening Construction project in Jefferson County, Kentucky. The scope of work includes reconstructing River Road from Clay Street to Zorn Avenue into a 4-lane facility, including new sidewalks, a new multi-use path for bicyclists and pedestrians, and a new traffic signal at River Road and Edith Road. The project is a partnership between Louisville Metro Government and the Kentucky Transportation Cabinet (KYTC), with construction expected to begin in Spring 2026.
CityKY
Jul 10, 2026
Closes
Aug 17, 2026
Reconstruction of river road to a 4-lane facility. This project includes new sidewalks, a new multi-use path, and a new light. 20 LF of standard curb and gutter modifications; 19,081LF of standard integral curb; 2,018 LF of 6' chain link fence; 179 Ton asphalt pavement milling and texturing; 3,055 SY of 4" concrete sidewalk; 2 EA 4" PVC pipe; 2,706 SY of erosion control blanket; pavement markings; 1,199 LF of sawcut pavement; 60 EA bollards; 4,981 LF of 15" storm sewer pipe; 1,557 LF of 18" storm sewer pipe; 7 EA bypass manhole; 4,641 LF of trenching and back filling; 60 LF of waterline encasement steel bored ranges; 6 EA fire hydrant assembly; 4,200 LF of 12" ductile iron waterline pipe; 60 LF of 24" welded steel waterline casing pipe. See attached files.
CityKY
Jul 10, 2026
Closes
Aug 10, 2026
The City of Louisville (Department of Public Works) has posted IFB260043 for River Road Widening Construction, a public works IFB to reconstruct River Road into a 4-lane facility from Clay Street to Zorn Ave including new sidewalks, a multi-use path, and a new traffic signal. Bidders must be prequalified with the Kentucky Transportation Cabinet (Certificate of Eligibility when bids are opened), provide a bid bond of at least 5% of the total bid, and may download solicitation templates and forms from the buyer portal (registration/login required). A pre-bid meeting is scheduled for July 22, 2026 at 10:00 AM and the solicitation is open for submissions through the close date shown on the buyer site.