CityAZ
Posted
Oct 9, 2025
Dec 1, 2026
Project Management/ Construction Management Services (Request for Qualifications)
Project management/ construction management services.
Description: Provide construction management services for the city's downtown project, from pre-construction and design-phase support through bidding and award assistance, construction management, and project closeout.
City · CA, US
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
465 days before RFP
The adopted CIP plans the Downtown Thousand Oaks Project through design and environmental work in FY 2026-27 and construction in FY 2028-30, with a total project budget of $156,278,659.
- CI5540 - Capital Improvement Program Facility Projects Downtown Thousand Oaks Project Description: Redevelopment of the Civic Arts Plaza property, introduction of a new activated Main Street south of Thousand Oaks Boulevard, creation of public plazas and squares, and preparation/solicitation of the Westside parcel for a mixed-use building to be developed…
City of Thousand Oaks Capital Improvement Program Budget 2025-2030
Capital improvement plan · Jun 10, 2025
Downtown Thousand Oaks Project 551,326 5,000,000 61,000,000
City of Thousand Oaks Capital Improvement Program Budget 2025-2030
Capital improvement plan · Jun 10, 2025
Strategic plan
198 days before RFP
The public-review-draft Specific Plan proposed a Phase 1 package of access, roadway, utility, culvert, demolition, detention, and grading works to maintain theatre operations and prepare the Downtown site.
ii. Phase 1 Throughout the course of construction and implementation of the Downtown Core, it is anticipated that the existing Kavli and Sherr Forum theatres will remain functional and operating. As such, before any significant grading and infrastructure work can occur, a new access road to the existing parking structure and to the Scherr Forum service…
RFP published
Proposals due (Closed)
City Of Thousand Oaks Specific Plan
Strategic plan · Mar 4, 2026
CAPSP I-3 Complete Final Design for Phase 1 infrastructure and road improvements. Finalize engineering plans and secure necessary permits. Coordinate construction phasing with utility providers and adjacent development timelines to minimize disruption and ensure timely delivery. Prior to issuance of grading permits for any component included in Phase 1 CM,…
City Of Thousand Oaks Specific Plan
Strategic plan · Mar 4, 2026
conveys flows west to Arroyo Conejo Creek, which is not listed as impaired. The project requires 21,450 cubic feet of detention volume and would provide 42,645 cubic feet, resulting in a surplus of 21,195 cubic feet. Three new detention systems and one modified existing system would reduce discharge to the VCWPD RCB. The project would relocate approximately…
City Of Thousand Oaks Specific Plan
Strategic plan · Mar 4, 2026
Phase 1 will be required to be substantially completed before the construction of any subsequent phases can occur. Phases 2A, 2B, and 2C can occur simultaneously and are not physically dependent on one another; however, the specific timing for completion of each of these phases will depend on available funding. For purposes of the proposed project, Phases…
City Of Thousand Oaks Specific Plan
Strategic plan · Apr 21, 2026
CAPSP I-3 Complete Final Design for Phase 1 infrastructure and road improvements. Finalize engineering plans and secure necessary permits. Coordinate construction phasing with utility providers and adjacent development timelines to minimize disruption and ensure timely delivery. Prior to issuance of grading permits for any component included in Phase 1 CM,…
City Of Thousand Oaks Specific Plan
Strategic plan · Apr 21, 2026
These related opportunities are still open for bidding.
CityAZ
Posted
Oct 9, 2025
Dec 1, 2026
Project management/ construction management services.
CityTX
Posted
Nov 5, 2026
Dec 2, 2026
The City of Andrews is procuring professional construction project management services to support a range of municipal capital projects, including new building construction, renovations, water and wastewater infrastructure improvements, street construction/rehabilitation, and other city projects. Services will include design coordination, value engineering, management of design professionals, construction administration and inspections, scheduling and reporting, change order administration, and oversight through project acceptance and closeout. The selected firm must be licensed to practice in Texas and demonstrate multi-discipline experience, capacity, and prior municipal construction management performance.
Metropolitan Transportation Commission
Special DistrictCA
Posted
Jul 16, 2026
Jun 1, 2027
Construction management services.
OtherFL
Posted
Oct 29, 2026
Dec 1, 2026
Provide part-time construction project manager/owners representative services.
Decision makers connected to this RFP from City of Thousand Oaks.