CountyCA
Aug 12, 2026
Closes
Sep 29, 2026
Hill Road Bridge Replacement Over Mill Creek RFP
Work consists of bridge replacement, includes 1,400 LF of temporary silt fence; 12,000 SF of remove existing HMA; 200 CY of roadway excavation; 4,350 CY of imported borrow; 551 CY of structure excavation, bridge; 150 CY of structure backfill, bridge; 31,145 SF of erosion control; 666 CY of aggregate base; 475 TON of hot mix asphalt (type b); 2,510 LF of furnish piling, bridgel; 1,900 LF of thermoplastic traffic stripe - detail 27b; 700 LF of thermoplastic traffic stripe - detail 21; 230 LF of guardrail system (wood post); 77 SF of pavement marking.