Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Town of Carrboro solicits CEI and construction contract administration services for Morgan Creek Greenway Phase 1 (approx. 1,723 linear feet pedestrian greenway, two pedestrian bridges ~100' and ~55', retaining walls and stream buffers). Requires NCDOT prequalification for Work Codes 233 and 195, NC-registered Professional Engineers for responsible charge, $1,000,000 professional liability insurance, 2-year cost-plus contract; submit a Letter of Interest (LOI) with completed RS-2 forms, 15-page LOI limit.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Town of Carrboro seeks qualified firms to provide Construction Engineering and Inspection (CEI) services for the Morgan Creek Greenway Phase 1 project (TIP# EL-4828A). Work includes construction contract administration and inspection for approximately 1,723 linear feet of greenway and two pedestrian bridges (about 100 ft and 55 ft), with associated clearing, grading, drainage, landscaping, erosion control, and fencing. Firms must be NCDOT-prequalified for the relevant CEI work codes; Letters of Interest are due by January 2, 2026 at 3:00 PM EST.
Posted Date
Dec 7, 2025
Due Date
Jan 2, 2026
Close: Jan 2, 2026
The Town of Carrboro seeks qualified firms to provide Construction Engineering and Inspection (CEI) services for the Morgan Creek Greenway Phase 1 project (TIP# EL-4828A). Work includes construction contract administration and inspection for approximately 1,723 linear feet of greenway and two pedestrian bridges (about 100 ft and 55 ft), with associated clearing, grading, drainage, landscaping, erosion control, and fencing. Firms must be NCDOT-prequalified for the relevant CEI work codes; Letters of Interest are due by January 2, 2026 at 3:00 PM EST.
AvailableConstruction of approximately 0.28 miles of asphalt paving, 0.05 miles of concrete paving, and 155 linear feet of structures, including clearing, grading, paving, structures, drainage, and erosion control for the Morgan Creek Greenway Phase 1.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Construction of approximately 0.28 miles of asphalt paving, 0.05 miles of concrete paving, and 155 linear feet of structures, including clearing, grading, paving, structures, drainage, and erosion control for the Morgan Creek Greenway Phase 1.
AvailableSauk creek greenway phase 3 & 4.
Posted Date
Oct 14, 2024
Due Date
Dec 18, 2025
Release: Oct 14, 2024
Close: Dec 18, 2025
Sauk creek greenway phase 3 & 4.
AvailableProfessional Construction Engineering and Inspection (CEI) services which are required for constructability reviews, contract administration, inspection, and materials sampling and testing for the reconstruction of 3 miles of drive.
Posted Date
Dec 12, 2025
Due Date
Jan 22, 2026
Release: Dec 12, 2025
Close: Jan 22, 2026
Professional Construction Engineering and Inspection (CEI) services which are required for constructability reviews, contract administration, inspection, and materials sampling and testing for the reconstruction of 3 miles of drive.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis