Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct a concrete sidewalk connecting the South Park, west parking lot to the sidewalk leading to the concession stand along with a concrete dropoff pad just west of the park sign.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
2026 concrete curb and sidewalk bid, which involves the replacement of existing concrete sidewalk, concrete curb, and driveway aprons on various streets in the township.
Posted Date
Dec 21, 2025
Due Date
Jan 23, 2026
Release: Dec 21, 2025
Close: Jan 23, 2026
2026 concrete curb and sidewalk bid, which involves the replacement of existing concrete sidewalk, concrete curb, and driveway aprons on various streets in the township.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Dec 1, 2025
Close: Dec 24, 2025
Citywide concrete sidewalk reconstruction.
Project consists of replacing concrete sidewalks and exterior stairs and includes minor earthwork and installation of new metal handrails and guardrails.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Project consists of replacing concrete sidewalks and exterior stairs and includes minor earthwork and installation of new metal handrails and guardrails.
AvailableConstruct a sidewalk. The sidewalk, crosswalk, and pedestrian ramps shall adhere to current ADA standards. Clearing, grubbing, and grading, utility relocation, concrete sidewalk 4" 3,000 psi, detectable crosswalk warning material, inlet protection systems, crosswalk ramps (ada ramps), driveway adjustments.
Posted Date
Dec 22, 2025
Due Date
Jan 22, 2026
Release: Dec 22, 2025
Close: Jan 22, 2026
Construct a sidewalk. The sidewalk, crosswalk, and pedestrian ramps shall adhere to current ADA standards. Clearing, grubbing, and grading, utility relocation, concrete sidewalk 4" 3,000 psi, detectable crosswalk warning material, inlet protection systems, crosswalk ramps (ada ramps), driveway adjustments.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →