Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Citywide concrete sidewalk reconstruction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 1, 2025
Close: Dec 24, 2025
Citywide brick sidewalk reconstruction.
AvailablePremium
Access the largest public sector contact database
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Close: Jan 30, 2026
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Available2026 curb, gutter, sidewalk replacement and 2026 citywide accessible pedestrian ramp. Remove and replace existing damaged concrete sidewalks, driveways, curb and gutter, valley gutter, and wheelchair accessible curb ramps; remove roots; root prune trees; and install root barriers at various locations.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
2026 curb, gutter, sidewalk replacement and 2026 citywide accessible pedestrian ramp. Remove and replace existing damaged concrete sidewalks, driveways, curb and gutter, valley gutter, and wheelchair accessible curb ramps; remove roots; root prune trees; and install root barriers at various locations.
AvailableProvide catch basin and manhole reconstruction program.
Posted Date
Dec 4, 2025
Due Date
Dec 31, 2025
Release: Dec 4, 2025
Close: Dec 31, 2025
Provide catch basin and manhole reconstruction program.