Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes CIPP lining approx. 5,500 LF of 6" to 12" sanitary sewer, nineteen (19) T-Liner installations, three (3) 10-foot CIPP partial liner of 10" sanitary sewer, and manhole rehabilitation of fifteen (15) sanitary manholes.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Outfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
Posted Date
Dec 15, 2025
Due Date
Feb 3, 2026
Release: Dec 15, 2025
Close: Feb 3, 2026
Outfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
Available2025 sewer rehabilitation project.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
2025 sewer rehabilitation project.
AvailableWork includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
Posted Date
Jan 13, 2026
Due Date
Feb 17, 2026
Release: Jan 13, 2026
Close: Feb 17, 2026
Work includes 2,250 LF portland cement concrete sidewalk replacement; 622 LF portland cement concrete curb and gutter replacement; 2,200 LF 8" pvc sanitary sewer main replace existing in place (open trench); 2 EA install new sanitary sewer manhole in new location; 5 EA remove and replace existing sanitary sewer manhole in place; 1 LS remove sanitary sewer rodding inlet; 3 EA sanitary sewer main connection to existing manhole; 1 EA existing sanitary sewer manhole rehabiiltation; 43 EA 4" sanitary sewer lateral, cleanout, and box replacement (open trench). See attached file.
AvailableThe project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
Posted Date
Jan 13, 2026
Due Date
Jan 30, 2026
Release: Jan 13, 2026
Close: Jan 30, 2026
The project includes removal and replacement of sanitary sewer pipes and manholes, replacement of storm sewer pipe, asphalt roadway restoration, and related site restorations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis