Summary
Proposed project improvements include bituminous pavement removal, storm sewer improvements, water main improvements, grading, aggregate base, concrete curb and gutter, bituminous surfacing, pedestrian ramp improvements, and restoration. Remove Manhole/Catch Basin - 26 EA; Remove Bituminous Pavement 11,000 SY; Remove Bituminous Walk - 12,500 SF; Remove Concrete Walk 19,250 SF; Remove Curb & Gutter 5,800 LF; Remove Sewer/Water/Storm Pipe 1,285 LF; Common Excavation - 14,000 CY; Aggregate Base Class - 53,100 CY; Bituminous Pavement - 2,500 Ton; 4” Perforated PVC Pipe Drain - 7,000 LF; Drainage Structure (48” - 72”) 47 EA; RC Pipe Sewer (15”-24”) - 1,150 LF; Concrete Walk - 28,550 SF; Concrete Curb and Gutter - 6,500 LF; Seeding - 1.3 AC; Boulevard Topsoil Borrow - 500 CY; Silt Fence Type MS - 1,800 LF; 12” DIP Watermain - 85 LF.