Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Concrete Slab with Boiler and Radiant Heat, and Solar Array for a New Greenhouse
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consist of installing a new concrete foundation and slab for a new 52' x 30 2" x 11' storage building with a 10 lean-to.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
Work consist of installing a new concrete foundation and slab for a new 52' x 30 2" x 11' storage building with a 10 lean-to.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace concrete slab and base.
Posted Date
Jan 5, 2026
Due Date
Feb 3, 2026
Release: Jan 5, 2026
Close: Feb 3, 2026
Replace concrete slab and base.
AvailableStructure Steel: Concrete Slab On Fabricated Steel Girder.
Posted Date
Nov 14, 2025
Due Date
Jan 13, 2026
Release: Nov 14, 2025
Close: Jan 13, 2026
Structure Steel: Concrete Slab On Fabricated Steel Girder.
AvailableWork includes approx. 3,386 SY of concrete (7" thick) will be replaced. These will include 7" thick selected slab replacement on streets in the city. Includes saw cuts are required prior to the start of slab removals at locations marked in the field; break up, remove and properly dispose of existing concrete slabs; see outside link.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Work includes approx. 3,386 SY of concrete (7" thick) will be replaced. These will include 7" thick selected slab replacement on streets in the city. Includes saw cuts are required prior to the start of slab removals at locations marked in the field; break up, remove and properly dispose of existing concrete slabs; see outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →