Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project will consist of curb and gutter and sidewalk replacement to improve drainage.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bids requested for the construction of 205th Avenue Improvements, encompassing excavation, paving, culvert installation, fencing, striping, signing, and segmental retaining wall construction.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
Close: Dec 19, 2025
Bids requested for the construction of 205th Avenue Improvements, encompassing excavation, paving, culvert installation, fencing, striping, signing, and segmental retaining wall construction.
AvailablePremium
Access the largest public sector contact database
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
AvailableWork consists 500 SY of 8" concrete street section paving w"diameter dowels; 500 SY of removal of existing concrete street sections; 200 CY of limestone bedding; 80 CY of fill material for roadbed (sand); 550 SY of grading and earthwork street compaction base; 100 LF of saw cutting of concrete; 50 LF of joint & crackfilling of concrete & asphalt cracks (asphalt emulsion); 120 CY of hauling and disposal of removed concrete; see attached file.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Work consists 500 SY of 8" concrete street section paving w"diameter dowels; 500 SY of removal of existing concrete street sections; 200 CY of limestone bedding; 80 CY of fill material for roadbed (sand); 550 SY of grading and earthwork street compaction base; 100 LF of saw cutting of concrete; 50 LF of joint & crackfilling of concrete & asphalt cracks (asphalt emulsion); 120 CY of hauling and disposal of removed concrete; see attached file.
AvailableWork include 328 SY pavement removed; 44 CY excavation; 59 CY embankment; 6,570 Sf 4" concrete walk; 528 SF curb ramp; 1,954 SY seeding and mulching; 13 EA catch basin adjustment; 400 SY pavement repair; 7,391 SY pavement planing, asphalt concrete; 257 CY asphalt concrete surface course; 103 SY 6" non-reinforced concrete pavement; 56 LF full depth pavemnt sawing.
Posted Date
Nov 19, 2025
Due Date
Dec 16, 2025
Release: Nov 19, 2025
Close: Dec 16, 2025
Work include 328 SY pavement removed; 44 CY excavation; 59 CY embankment; 6,570 Sf 4" concrete walk; 528 SF curb ramp; 1,954 SY seeding and mulching; 13 EA catch basin adjustment; 400 SY pavement repair; 7,391 SY pavement planing, asphalt concrete; 257 CY asphalt concrete surface course; 103 SY 6" non-reinforced concrete pavement; 56 LF full depth pavemnt sawing.