Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists 500 SY of 8" concrete street section paving w"diameter dowels; 500 SY of removal of existing concrete street sections; 200 CY of limestone bedding; 80 CY of fill material for roadbed (sand); 550 SY of grading and earthwork street compaction base; 100 LF of saw cutting of concrete; 50 LF of joint & crackfilling of concrete & asphalt cracks (asphalt emulsion); 120 CY of hauling and disposal of removed concrete; see attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Jan 8, 2026
Close: Feb 12, 2026
Road improvements.
AvailableWork includes approx. 2 watermain offsets 1 watermain lateral 5 sanitary manhole chimney, frame and cover replacement; 400 LF of 12" RCP storm sewer pipe; 850 LF of 15" RCP storm sewer pipe; 150 LF of 18" RCP storm sewer pipe; 9"-72" storm inlets; 4,000 SY of pavement removal (base bid); 8,800 SY of pavement removal (alt bid); 5,500 TON of base aggregate; 2,600 LF Of concrete curb and gutter; 11,500 SF of walk and drive approach; 8,800 SY of 8" concrete pavement (alt bid); 4,700 SY of Mill existing asphalt (base bid); 1,925 TON of HMA pavement (base bid); 4,310 LF Of pavement markings; 2,500 SY of topsoil and sod.
Posted Date
Jan 16, 2026
Due Date
Feb 6, 2026
Release: Jan 16, 2026
Close: Feb 6, 2026
Work includes approx. 2 watermain offsets 1 watermain lateral 5 sanitary manhole chimney, frame and cover replacement; 400 LF of 12" RCP storm sewer pipe; 850 LF of 15" RCP storm sewer pipe; 150 LF of 18" RCP storm sewer pipe; 9"-72" storm inlets; 4,000 SY of pavement removal (base bid); 8,800 SY of pavement removal (alt bid); 5,500 TON of base aggregate; 2,600 LF Of concrete curb and gutter; 11,500 SF of walk and drive approach; 8,800 SY of 8" concrete pavement (alt bid); 4,700 SY of Mill existing asphalt (base bid); 1,925 TON of HMA pavement (base bid); 4,310 LF Of pavement markings; 2,500 SY of topsoil and sod.
Installation of street and drainage improvements to Circle K Road & Ranch Road in Coffee County, Georgia.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
Installation of street and drainage improvements to Circle K Road & Ranch Road in Coffee County, Georgia.
AvailableThe Borough of Madison is seeking bids for road improvements, including milling, resurfacing, curb and sidewalk reconstruction, ADA ramp improvements, drainage, and traffic stripe/marking installation.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
The Borough of Madison is seeking bids for road improvements, including milling, resurfacing, curb and sidewalk reconstruction, ADA ramp improvements, drainage, and traffic stripe/marking installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis