Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Commercial new const. /rehab finish work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Prek-5 finish floor replacement and miscellaneous work general, asbestos, mechanical, plumbing and electrical.
Posted Date
Jan 4, 2026
Due Date
Feb 10, 2026
Release: Jan 4, 2026
Close: Feb 10, 2026
Prek-5 finish floor replacement and miscellaneous work general, asbestos, mechanical, plumbing and electrical.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of rehab and replace filter underdrains and media.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Work consist of rehab and replace filter underdrains and media.
AvailableThe project includes the rehab of the existing influent wastewater pump station. The work also includes rehab of the junction box that collects flow from PS and flows into the treatment plant headworks. A bypass pumping connection on the 36" force main will be installed to facilitate the junction box rehab work. The project will also include the replacement of valves at the overflow basin on the west side of the site.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
The project includes the rehab of the existing influent wastewater pump station. The work also includes rehab of the junction box that collects flow from PS and flows into the treatment plant headworks. A bypass pumping connection on the 36" force main will be installed to facilitate the junction box rehab work. The project will also include the replacement of valves at the overflow basin on the west side of the site.
AvailableProvide housing rehab. Repairs include carpentry, electrical, flooring, HVAC, plumbing, and site work.
Posted Date
Dec 29, 2025
Due Date
Jan 15, 2026
Release: Dec 29, 2025
Close: Jan 15, 2026
Provide housing rehab. Repairs include carpentry, electrical, flooring, HVAC, plumbing, and site work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →