CityFL
Posted
Nov 9, 2026
Dec 11, 2026
Day Dock At Riverwalk Park RFP
Work includes 2,750 CY mechanical dredging (hauling and placement at final disposal site); 880 SF timber dock (includes 12" timber piles); 1 EA aluminum gangway (30' x 7'); 1,315 SF concrete floating dock system (includes 14" concrete & 12" timber mooring piles, aluminum railing); 8 EA private aids to navigation (includes piles, lights, and signs); 53 SY concrete sidewalk; 12 LF concrete grade beam; 30 LF concrete flush curb; 1 LS pavement marking; 1 LS fire hydrant (includes 6" fire main and connection to existing system); 1 LS fdc & standpipe system (includes pipes, appurtenances, testing & signs). See outside link.