Summary
Project includes the following Work: Construct a Combined Sewer Control Facility consisting of screening equipment, flow control equipment, chemical storage and dosing equipment, odor control equipment and associated duct work, chlorine contact tank, outfall sewer, plumbing, HVAC, electrical, SCADA systems, site work. Provision of all labor, materials, equipment, and incidental items to construct an influent sewer that includes a railroad crossing, structural support piers, site work, new concrete energy dissipation structure and associated items. Separate Bids will be received for the following Contracts: Contract No. Description of Contract: 1G General Construction; 1E Electrical Construction; 1P Plumbing Construction; 1H
HVAC Construction.