Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes the conversion of a classroom in the Skills Center into a lab for additive manufacturing on the Columbia Gorge Community College Campus. The renovation will include demolition of existing walls and finishes and the new construction of open lab space and material storage room. The material storage room has special construction requirements due to potential ignition of metal powders stored and handled on the space.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes selective demolition, interior concrete cutting/trenching, interior metal stud and drywall partitions, drywall finishing, specialties, doors, frames, hardware, acoustic/decorative ceilings, finish carpentry, casework, countertops, caulking. Priming, painting, and wallcoverings. Floor preparation, carpet tile, LVT flooring, vinyl base, floor protection, and ceramic tile accent walls. Plumbing, HVAC, and vacuum system for dental lab. MSMR of existing electrical equipment, electrical rough-in, electrical fixtures, fire alarm, and low voltage. Revisions to existing fire suppression system in dental lab.
Posted Date
Jan 20, 2026
Due Date
Feb 17, 2026
Release: Jan 20, 2026
Close: Feb 17, 2026
Work includes selective demolition, interior concrete cutting/trenching, interior metal stud and drywall partitions, drywall finishing, specialties, doors, frames, hardware, acoustic/decorative ceilings, finish carpentry, casework, countertops, caulking. Priming, painting, and wallcoverings. Floor preparation, carpet tile, LVT flooring, vinyl base, floor protection, and ceramic tile accent walls. Plumbing, HVAC, and vacuum system for dental lab. MSMR of existing electrical equipment, electrical rough-in, electrical fixtures, fire alarm, and low voltage. Revisions to existing fire suppression system in dental lab.
AvailableMadison Area Technical College (Madison College) issued an Invitation for Bid for the Classroom Renovation Project to convert a computer lab and perform associated construction/architectural work. The solicitation was broadcast 2026-01-15 and remains open with a close date of 2026-02-05; a non-mandatory pre-bid walk-through is scheduled for 2026-01-22 at 1:00 p.m. CST. Bid documents are distributed via the college’s DemandStar posting (buyer uses DemandStar for bid distribution) and require accessing that posting to download the bid package.
Posted Date
Jan 15, 2026
Due Date
Feb 5, 2026
Release: Jan 15, 2026
Close: Feb 5, 2026
Madison Area Technical College (Madison College) issued an Invitation for Bid for the Classroom Renovation Project to convert a computer lab and perform associated construction/architectural work. The solicitation was broadcast 2026-01-15 and remains open with a close date of 2026-02-05; a non-mandatory pre-bid walk-through is scheduled for 2026-01-22 at 1:00 p.m. CST. Bid documents are distributed via the college’s DemandStar posting (buyer uses DemandStar for bid distribution) and require accessing that posting to download the bid package.
Physics building lab 186 renovation - 2026.
Posted Date
Jan 16, 2026
Due Date
Feb 19, 2026
Release: Jan 16, 2026
Close: Feb 19, 2026
Physics building lab 186 renovation - 2026.
AvailableHouston Community College seeks competitive sealed bids to renovate a 1,895 sq. ft. Anatomy and Physiology lab at its Acres Homes Campus in Houston, Texas. The work includes selective demolition, new laboratory casework, underfloor plumbing for sinks and eyewash stations (with slab restoration), updated power/data, lighting reconfiguration, and limited architectural/mechanical modifications to meet the updated lab layout. The project is intended to support current instructional needs and address deferred maintenance, and must conform to HCC standards and construction documents.
Posted Date
-
Due Date
Feb 17, 2026
Close: Feb 17, 2026
Houston Community College seeks competitive sealed bids to renovate a 1,895 sq. ft. Anatomy and Physiology lab at its Acres Homes Campus in Houston, Texas. The work includes selective demolition, new laboratory casework, underfloor plumbing for sinks and eyewash stations (with slab restoration), updated power/data, lighting reconfiguration, and limited architectural/mechanical modifications to meet the updated lab layout. The project is intended to support current instructional needs and address deferred maintenance, and must conform to HCC standards and construction documents.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis