Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Columbia Gorge Community College
Construct comprehensive roofing renewals at Building Nos. 2 and 4. Remove existing low-slope roof assembly down to the structural deck and install an adhered roof assembly with air barrier, vapor retarder, tapered insulation, rigid coverboard, and modified-bitumen membrane roof. Integrate new drains into existing plumbing in sumped profiles. Apply cold fluid-applied liquid flashings at critical transitions, details, and penetrations. Work at Building No. 2 includes: Install new waterproofing at the exposed concrete structure and integrate with the lower roof; and install a new skylight.
Posted Date
Feb 12, 2026
Due Date
Mar 5, 2026
Release: Feb 12, 2026
Columbia Gorge Community College
Close: Mar 5, 2026
Construct comprehensive roofing renewals at Building Nos. 2 and 4. Remove existing low-slope roof assembly down to the structural deck and install an adhered roof assembly with air barrier, vapor retarder, tapered insulation, rigid coverboard, and modified-bitumen membrane roof. Integrate new drains into existing plumbing in sumped profiles. Apply cold fluid-applied liquid flashings at critical transitions, details, and penetrations. Work at Building No. 2 includes: Install new waterproofing at the exposed concrete structure and integrate with the lower roof; and install a new skylight.
Columbia Gorge Community College
The work consists of: The Dalles Campus: ADA Entrance Building #1; Parking and Pathway Improvements Building #5 - provide new ADA compliant pathway to building #1 and new parking area with adjacent asphalt pathway and concrete valley gutter including concrete stairs and sidewalk to building #5. Hood River Campus: Campus-wide Paving Rehabilitation & Concrete Generator Pad - construct pavement surface restoration including crack-seal; asphalt removal and replacement of cracks greater than 1/2" wide; and final seal coat placement with restriping of all parking stalls.
Posted Date
Feb 4, 2026
Due Date
Feb 26, 2026
Release: Feb 4, 2026
Columbia Gorge Community College
Close: Feb 26, 2026
The work consists of: The Dalles Campus: ADA Entrance Building #1; Parking and Pathway Improvements Building #5 - provide new ADA compliant pathway to building #1 and new parking area with adjacent asphalt pathway and concrete valley gutter including concrete stairs and sidewalk to building #5. Hood River Campus: Campus-wide Paving Rehabilitation & Concrete Generator Pad - construct pavement surface restoration including crack-seal; asphalt removal and replacement of cracks greater than 1/2" wide; and final seal coat placement with restriping of all parking stalls.
Columbia Gorge Community College
Roofing renewal of Buildings 1, 2, and 4 includes: Remove existing low-slope roof assembly down to the structural deck; install an adhered roof assembly with air barrier, vapor, retarder, code-compliant tapered insulation, rigid coverboard, and modified bitumen membrane roof; manage water internally with new drains integrated into existing plumbing; apply cold fluid liquid flashings at critical transitions, details, and penetrations; construct framed parapets; add overflow drains, including discharge penetrations at the exterior walls and overflow rainwater leaders in the interstitial ceiling space at the upper floor; waterproof exposed concrete and integrate into lower roof; install new skylight at the low roof zone.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Columbia Gorge Community College
Close: Jan 22, 2026
Roofing renewal of Buildings 1, 2, and 4 includes: Remove existing low-slope roof assembly down to the structural deck; install an adhered roof assembly with air barrier, vapor, retarder, code-compliant tapered insulation, rigid coverboard, and modified bitumen membrane roof; manage water internally with new drains integrated into existing plumbing; apply cold fluid liquid flashings at critical transitions, details, and penetrations; construct framed parapets; add overflow drains, including discharge penetrations at the exterior walls and overflow rainwater leaders in the interstitial ceiling space at the upper floor; waterproof exposed concrete and integrate into lower roof; install new skylight at the low roof zone.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Columbia Gorge Community College
This Master Agreement between Campus Management Corp. and Columbia Gorge Community College outlines the provision of Software as a Service (SaaS), software, and professional services. The agreement, effective June 13, 2018, with SaaS services commencing July 1, 2018, for an initial seven-year term, includes CampusNexus Student, CRM, Finance, HR, & Payroll, and Talisma Fundraising. It specifies a one-time deployment fee of $6,907.66 and monthly fees of $9,044.50, payable quarterly at $27,133.50. The contract details general terms, SaaS tiers, support and upgrade services, and a Service Level Agreement.
Effective Date
Jul 1, 2018
Expires
Effective: Jul 1, 2018
Columbia Gorge Community College
Expires:
This Master Agreement between Campus Management Corp. and Columbia Gorge Community College outlines the provision of Software as a Service (SaaS), software, and professional services. The agreement, effective June 13, 2018, with SaaS services commencing July 1, 2018, for an initial seven-year term, includes CampusNexus Student, CRM, Finance, HR, & Payroll, and Talisma Fundraising. It specifies a one-time deployment fee of $6,907.66 and monthly fees of $9,044.50, payable quarterly at $27,133.50. The contract details general terms, SaaS tiers, support and upgrade services, and a Service Level Agreement.
Columbia Gorge Community College
This document outlines two agreements between Anthology Inc. and Columbia Gorge Community College. The primary agreement, SOW No. PSSC-24601012909, details professional services support and maintenance for various software packages, with an annual fixed fee of $57,700 for an initial period from July 1, 2023, to June 30, 2024, with automatic annual renewals. The secondary agreement is Change Order #4, which amends a separate SOW (PSTSPKG-20220316557) to renew its term from April 1, 2023, to June 30, 2024, and carry over 50 unused hours at no additional cost.
Effective Date
Jul 1, 2023
Expires
Effective: Jul 1, 2023
Columbia Gorge Community College
Expires:
This document outlines two agreements between Anthology Inc. and Columbia Gorge Community College. The primary agreement, SOW No. PSSC-24601012909, details professional services support and maintenance for various software packages, with an annual fixed fee of $57,700 for an initial period from July 1, 2023, to June 30, 2024, with automatic annual renewals. The secondary agreement is Change Order #4, which amends a separate SOW (PSTSPKG-20220316557) to renew its term from April 1, 2023, to June 30, 2024, and carry over 50 unused hours at no additional cost.
Columbia Gorge Community College
This Master Agreement between Campus Management Corp. and Columbia Gorge Community College outlines the terms for Software as a Service (SaaS), software, and professional services. The initial term for the SaaS and services is seven years, commencing July 1, 2018, with automatic one-year renewals. The agreement details specific CampusNexus software modules and Talisma Fundraising, along with associated one-time deployment fees and monthly recurring fees. It includes comprehensive General Terms covering legal, financial, and operational aspects, as well as Exhibits for SaaS scope, tiers, support, and service level agreements. T&Cs are provided within the document.
Effective Date
Jul 1, 2018
Expires
Effective: Jul 1, 2018
Columbia Gorge Community College
Expires:
This Master Agreement between Campus Management Corp. and Columbia Gorge Community College outlines the terms for Software as a Service (SaaS), software, and professional services. The initial term for the SaaS and services is seven years, commencing July 1, 2018, with automatic one-year renewals. The agreement details specific CampusNexus software modules and Talisma Fundraising, along with associated one-time deployment fees and monthly recurring fees. It includes comprehensive General Terms covering legal, financial, and operational aspects, as well as Exhibits for SaaS scope, tiers, support, and service level agreements. T&Cs are provided within the document.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Board meetings and strategic plans from Columbia Gorge Community College
The board approved a revised academic calendar for 2026-27 and authorized a contract renewal with Merchant McIntyre. Additionally, the board approved the suspension of an existing 12-credit Initial Early Childhood Education certificate and the introduction of a revised version. Other key topics included the approval of the Tuition and Fee Schedule for 2026-27, a review of bond-funded project progress, a presentation on community education programs, an update on quarterly audit findings, a review of general fund financial status, and reports from the College Foundation, the President, and the Oregon Community College Association.
The board meeting agenda includes discussion items related to Board of Education administrative rules and various degree approvals. Additionally, the meeting will feature reports on the Bond, the Small Business Development Center, mission fulfillment, financial status, OCCA updates, college operations, and the foundation. The board will also review reports from its subcommittees, including Policy & Engagement, Finance & Audit, and the President's Performance Review, followed by a report from the Chair.
The board addressed several administrative and academic matters, including the appointment of a new Budget Officer and the approval of the FY 2026-27 Budget Calendar. Several degree and certificate programs were suspended due to low enrollment, while a new Associate of Science Transfer in Psychology degree was approved to align with state transfer initiatives. The meeting also included updates on construction planning and bond projects, an instructional highlight of the Construction Technology program, analysis of enrollment trends, and a review of institutional learning outcomes. Financial and foundation reports were presented, alongside a presidential operational update covering legislative advocacy, student success initiatives, and athletic department developments.
The regular meeting included the approval of the agenda and the approval of the December 2025 minutes. Key business items involved the approval of the Board Self-Evaluation Survey Instrument, which is planned for electronic distribution. Additionally, the Board approved Sole Source Findings to procure additional components for the Silent Knight fire alarm system to ensure campus-wide compatibility due to updated fire code requirements. Report items covered the monthly Bond End of Month Report, the Annual Facilities Report detailing maintenance and infrastructure needs, and the Mission Fulfillment Report focusing on Advancing Equitable Student Learning, including enrollment trends and student success indicators. The Monthly Financial Report noted General Fund revenues and expenditures as of December 31, 2025, and discussed improvements to financial reporting clarity. Updates were also provided from the College Foundation, a Chinook Brief summarizing operational activities, and subcommittee reports from Policy & Equity and Finance & Audit.
The Board meeting included approval of the agenda and ratification of the August 2025 board meeting minutes. Key business items involved the approval of the proposed Bachelor of Applied Science in Education, which is the institution's first bachelor-level degree, anticipated to launch in Fall 2027 pending final approvals. The Board also approved the 2026-27 Academic Calendar. Report items covered the monthly bond update, highlighting design progress and cost concerns regarding HVAC upgrades, and an overview of the FY 2026-27 budget build process. The financial report included a review of General Fund revenues (noting a decrease largely due to delayed property tax adjustments) and expenditures as of November 30, 2025. The President provided an operational update detailing enrollment trends, community outreach, and the premature discontinuation of the Title III EASE grant activities at the end of 2025. The Board also received updates from the OCCA and discussed subcommittee activities. The session concluded with two executive sessions: one for labor negotiations, resulting in the ratification of the collective bargaining agreement for July 1, 2025-June 30, 2028, and another for the performance evaluation of the College President.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Columbia Gorge Community College's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Academic Assessment Coordinator and Psychology Instructor
Chemistry Instructor, Science Department Chair, & Moodle Administrator
Premium
Access the largest public sector contact database
© 2026 Starbridge