CityCA
Posted
Aug 3, 2026
Sep 28, 2026
Well C-4 Rehab, Pre & Post Video Survey, Brush & Bail, and Reinstallation
Work includes installation of test pump, motor and electrical connection, install pump, column, tube and shaft, motor and electrical connection, 600 FT ss poly coated 0. 25 airline & gauge, 30 EA 10" x 20" heavy wall 0. 365 column, 1 EA 1 15/16" 10 thread carbon steel line shaft couplings, 30 EA rubber centralizer, 22 EA 55 gallon drums of cotey chemical liquid acid. See attached file.