CityCA
Posted
Oct 15, 2026
Nov 11, 2026
Carlson Crosstown Project Phase II Project RFP
The work to be performed providing traffic control during the construction period, construction surveying, utility potholing, clearing, grubbing, and environmental protection, removal of concrete curbs, curb and gutters, sidewalk, and portions of medians, removal of trees and tree stumps, adjustment of underground utility surface features, placement of concrete curbs, curb and gutters, concrete medians, concrete curb ramps , concrete sidewalk, concrete bus stop, pavement repairs (base repairs and crack sealing), cold milling of asphalt pavement, conform grinding, hot mix asphalt (hma) paving, slurry seal, thermoplastic traffic striping and traffic markings including new bike lanes, flexible channelizers, armadillos, rectangular rapid flash beacon and pedestrian push buttons, traffic signal removal and replacement, street lighting, detector loops, removing and placing of signs and signposts, and other improvements.