Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sewer Rehabilitation, includes: 1,165 LF 8" CIPP lining; 1,795 LF 10" CIPP lining & 51 EA up to 5 LF CIPP lateral lining.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx. 74 lf of 8" sanitary sewer pipe (open cut); 10 LF of 10" Sanitary sewer pipe, (open cut); 105 LF of 15" Trenchless construction; 3,481 LF of CCTV inspection (pre-construction); 5 EA of (4' dia) sanitary sewer manhole (0 - 6 ft). See outside link.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Work includes approx. 74 lf of 8" sanitary sewer pipe (open cut); 10 LF of 10" Sanitary sewer pipe, (open cut); 105 LF of 15" Trenchless construction; 3,481 LF of CCTV inspection (pre-construction); 5 EA of (4' dia) sanitary sewer manhole (0 - 6 ft). See outside link.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Work under this contract includes but is not limited to installation of a cured-in-place pipe liner of approx 1,824 LF within a 26" x 36" brick sanitary sewer main located beneath Center Street NE. Work also includes the installation and maintenance of bypass sewer piping, reinstatement of service laterals and collector sewer connections, rehabilitation of existing sewer manholes, and repair at a utility cross-bored through the brick sewer.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
The Work under this contract includes but is not limited to installation of a cured-in-place pipe liner of approx 1,824 LF within a 26" x 36" brick sanitary sewer main located beneath Center Street NE. Work also includes the installation and maintenance of bypass sewer piping, reinstatement of service laterals and collector sewer connections, rehabilitation of existing sewer manholes, and repair at a utility cross-bored through the brick sewer.
AvailableThe Work under this contract includes but is not limited to installation of a cured-in-place pipe liner of approx 1,824 LF within a 26" x 36" brick sanitary sewer main located beneath Center Street NE. Work also includes the installation and maintenance of bypass sewer piping, reinstatement of service laterals and collector sewer connections, rehabilitation of existing sewer manholes, and repair at a utility cross-bored through the brick sewer.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
The Work under this contract includes but is not limited to installation of a cured-in-place pipe liner of approx 1,824 LF within a 26" x 36" brick sanitary sewer main located beneath Center Street NE. Work also includes the installation and maintenance of bypass sewer piping, reinstatement of service laterals and collector sewer connections, rehabilitation of existing sewer manholes, and repair at a utility cross-bored through the brick sewer.
AvailableThe City of Kent invites sealed bids for the Meeker Street – Washington Avenue to Interurban Trail corridor improvement project. The work includes new concrete sidewalks, landscaping and irrigation, asphalt overlay, a raised intersection and roundabout, channelization, lighting, RRFBs, and stormwater, watermain, and sanitary sewer replacements, with an estimated construction range of approximately $8–9 million and a 14% FSBE goal. Bids are due January 6, 2026 at 11:00 a.m. Pacific Time; plans and specifications are available through the City’s procurement page and only sealed paper bids will be accepted.
Posted Date
Dec 10, 2025
Due Date
Jan 6, 2026
Release: Dec 10, 2025
Close: Jan 6, 2026
The City of Kent invites sealed bids for the Meeker Street – Washington Avenue to Interurban Trail corridor improvement project. The work includes new concrete sidewalks, landscaping and irrigation, asphalt overlay, a raised intersection and roundabout, channelization, lighting, RRFBs, and stormwater, watermain, and sanitary sewer replacements, with an estimated construction range of approximately $8–9 million and a 14% FSBE goal. Bids are due January 6, 2026 at 11:00 a.m. Pacific Time; plans and specifications are available through the City’s procurement page and only sealed paper bids will be accepted.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →