Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
National Guard Bureau (NGB)
The work includes approx. 8.3 LM brooming & degrassing shoulders, 18 TN bituminous material for tack coat, signage, pavement marking.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Harvey County
Project consists of Microsurfacing for approximately 19.92 miles. Temporary pavement marking is included in this contract, subsidiary to Microsurfacing costs. Striping will be on the centerline only.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Harvey County
Close: Dec 15, 2025
Project consists of Microsurfacing for approximately 19.92 miles. Temporary pavement marking is included in this contract, subsidiary to Microsurfacing costs. Striping will be on the centerline only.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Marshfield
The Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Town of Marshfield
Close: Dec 19, 2025
The Project includes the following Work: Onion River Road, Bridge 27 – Install temporary bypass road, remove temporary bridge, demolish old bridge, installation of new bridge (95’ clear span, NEDBT40 precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction and associated work. Sass Ave, Bridge 17 – Demolish old bridge, installation of new bridge (75’ clear span, NEXT36D precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated work.
AvailableCity of Dickinson
This project will consist of the complete abatement of asbestos containing materials. Abatement of asbestos containing materials, including but not limited to: Green Linoleum & Black Mastic: Kitchen Apartment 9; White Finishing Compound: Living Room Apartment 9; White Textured Surfacing: Dining Room Apartment 9; Brown Tile: NW Bedroom, Apartment 9; Gray Tile & Black Mastic: NW Bedroom Apartment 9; Gray Tile: Entryway Apartment 10; Gray Tile: Living Room Apartment 10; Tan Linoleum & Tan Mastic: Bathroom Apartment 10; Brown Tile: Front Entry Apartment 10; Tan Tile: Front Entry Apartment 10; Gray Tile: Front Entry Apartment 10; Off White Linoleum: Kitchen Apartment 4; Tan Tile: Bedroom Apartment 4; Black Tile: Bedroom Apartment 4; Gray Tile: Bedroom Apartment 4; Gray Tile & Black Mastic: Center Aisle Apartment 12; Brown Tile & Black Mastic: Bedroom Apartment 12; Gray Tile: Living Room Apartment 12; White Textured Surfacing: Apartment 12; Gray Tile: Living Room Apartment 13; Gray Tile & Black Mastic: Bathroom Apartment 13; White Textured Surfacing: Apartment 13; Black Tile: Living Room Apartment 11; Off White Textured Surfacing: Apartment 11; Black Tile: Bedroom Apartment 11; Tan Tile & Black Mastic: Bedroom Apartment 11; Green Tile: Basement; Brown Tile & Black Mastic: Basement; Tan Tile: Basement; Tan Tile: Basement; Brown Tile: Basement; Brown Tile: Basement; Tan Insultation: Basement Pipes.
Posted Date
Nov 5, 2025
Due Date
Dec 17, 2025
Release: Nov 5, 2025
City of Dickinson
Close: Dec 17, 2025
This project will consist of the complete abatement of asbestos containing materials. Abatement of asbestos containing materials, including but not limited to: Green Linoleum & Black Mastic: Kitchen Apartment 9; White Finishing Compound: Living Room Apartment 9; White Textured Surfacing: Dining Room Apartment 9; Brown Tile: NW Bedroom, Apartment 9; Gray Tile & Black Mastic: NW Bedroom Apartment 9; Gray Tile: Entryway Apartment 10; Gray Tile: Living Room Apartment 10; Tan Linoleum & Tan Mastic: Bathroom Apartment 10; Brown Tile: Front Entry Apartment 10; Tan Tile: Front Entry Apartment 10; Gray Tile: Front Entry Apartment 10; Off White Linoleum: Kitchen Apartment 4; Tan Tile: Bedroom Apartment 4; Black Tile: Bedroom Apartment 4; Gray Tile: Bedroom Apartment 4; Gray Tile & Black Mastic: Center Aisle Apartment 12; Brown Tile & Black Mastic: Bedroom Apartment 12; Gray Tile: Living Room Apartment 12; White Textured Surfacing: Apartment 12; Gray Tile: Living Room Apartment 13; Gray Tile & Black Mastic: Bathroom Apartment 13; White Textured Surfacing: Apartment 13; Black Tile: Living Room Apartment 11; Off White Textured Surfacing: Apartment 11; Black Tile: Bedroom Apartment 11; Tan Tile & Black Mastic: Bedroom Apartment 11; Green Tile: Basement; Brown Tile & Black Mastic: Basement; Tan Tile: Basement; Tan Tile: Basement; Brown Tile: Basement; Brown Tile: Basement; Tan Insultation: Basement Pipes.
AvailableIowa Department of Transportation
Work includes : 4,998 gal asphalt emulsion, fog seal; 15,831 gal asphalt emulsion, microsurfacing; 43 CY excavation class 13; 100 LF guardrail, formed steel beam; see attached file.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Iowa Department of Transportation
Close: Dec 16, 2025
Work includes : 4,998 gal asphalt emulsion, fog seal; 15,831 gal asphalt emulsion, microsurfacing; 43 CY excavation class 13; 100 LF guardrail, formed steel beam; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →