Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacing the counter tops in the residence hall. Orchard hall has 40 kitchens that will receive a solid surface countertop in place of the current laminate. Solid surface materials such as corian are preferred (group a from LX HIMACS is preferred). This needs to include 4" backsplash.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Remove existing flooring in the residence hall rooms and lounges and install new flooring.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Remove existing flooring in the residence hall rooms and lounges and install new flooring.
AvailableWork include interior renovations to the residence rooms, offices, and community spaces on four (3) vertical "stacks" on four floors of the existing dorm facility. This project will improve maintenance capability in the balcony style residence halls. We will be replacing all vertical sanitary plumbing components in each stack, (4 stories) and replacing plumbing fixtures on each side of the stack. Work in each suite will include new sinks (2), toilets (2), shower, floor drain, fixture supply lines, clean outs, new shower plumbing fixtures and associated parts/piping (drain, shower arm/head, single lever valve). Replacement of any horizontal main piping in the crawl space is not included in the scope of work. The replacement shower material will be wiltcher industries solid surface (shower pans, walls, trim, soap /shampoo holder, footrests). The work will include new toilet exhaust system (including new roof mounted exhaust at each stack, new toilet finishes and accessories) in each toilet.
Posted Date
Dec 22, 2025
Due Date
Feb 6, 2026
Release: Dec 22, 2025
Close: Feb 6, 2026
Work include interior renovations to the residence rooms, offices, and community spaces on four (3) vertical "stacks" on four floors of the existing dorm facility. This project will improve maintenance capability in the balcony style residence halls. We will be replacing all vertical sanitary plumbing components in each stack, (4 stories) and replacing plumbing fixtures on each side of the stack. Work in each suite will include new sinks (2), toilets (2), shower, floor drain, fixture supply lines, clean outs, new shower plumbing fixtures and associated parts/piping (drain, shower arm/head, single lever valve). Replacement of any horizontal main piping in the crawl space is not included in the scope of work. The replacement shower material will be wiltcher industries solid surface (shower pans, walls, trim, soap /shampoo holder, footrests). The work will include new toilet exhaust system (including new roof mounted exhaust at each stack, new toilet finishes and accessories) in each toilet.
AvailableProvide hall renovation improvements. Work includes plumbing, demolition and removal work, hvac, electrical power and lighting.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
Provide hall renovation improvements. Work includes plumbing, demolition and removal work, hvac, electrical power and lighting.
AvailablePlumbing fixture replacement.
Posted Date
Jan 13, 2026
Due Date
Jan 29, 2026
Release: Jan 13, 2026
Close: Jan 29, 2026
Plumbing fixture replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis