Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovations, modifications, and addition of school.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Library expansion and renovation. Construction of a three-story addition, including an elevator. Alterations and renovations within the existing building, including replacement of the heating system with an HVAC system. Removal of Asbestos Containing Pipe Insulation in Basement.
Posted Date
Jan 4, 2026
Due Date
Feb 11, 2026
Release: Jan 4, 2026
Close: Feb 11, 2026
Library expansion and renovation. Construction of a three-story addition, including an elevator. Alterations and renovations within the existing building, including replacement of the heating system with an HVAC system. Removal of Asbestos Containing Pipe Insulation in Basement.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction manager-at- risk using the one-step process for services associated with construction of the high school gym & locker room addition and renovations.
Posted Date
Jan 15, 2026
Due Date
Feb 2, 2026
Release: Jan 15, 2026
Close: Feb 2, 2026
Construction manager-at- risk using the one-step process for services associated with construction of the high school gym & locker room addition and renovations.
AvailableProvide office addition and interior renovations.
Posted Date
Dec 22, 2025
Due Date
Jan 27, 2026
Release: Dec 22, 2025
Close: Jan 27, 2026
Provide office addition and interior renovations.
AvailablePaving, sidewalk and storm drainage improvements including new plantings and landscaping; dumpster enclosure, new curbside book drop; parking lot lighting, pergola shade structure; monument sign; 600SF one story wood framed masonry veneer Storage Room addition, shingle roof replacement, Womens and Mens Restroom renovations; Kitchenette renovation, Interior floor, wall and ceiling finish renovations; HVAC and lighting replacements; HC accessible door modifications and miscellaneous other renovations
Posted Date
-
Due Date
Feb 11, 2026
Close: Feb 11, 2026
Paving, sidewalk and storm drainage improvements including new plantings and landscaping; dumpster enclosure, new curbside book drop; parking lot lighting, pergola shade structure; monument sign; 600SF one story wood framed masonry veneer Storage Room addition, shingle roof replacement, Womens and Mens Restroom renovations; Kitchenette renovation, Interior floor, wall and ceiling finish renovations; HVAC and lighting replacements; HC accessible door modifications and miscellaneous other renovations
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →