Pedestrian Bridge - Bid Package 2 *CMAR*
Construction Management At-Risk (CMAR) project for a Pedestrian Bridge (Bid Package 2) consisting of 12 separate trade packages: 2.1 Flooring, 2.2 Floor Coatings, 2.3 Signage, 2.4 Metal Canopies, 2.5 Elevators, 2.6 Plumbing, 2.7 HVAC & Mechanical, 2.8 Electrical, 2.9 Earthwork & Grading, 2.10 Landscaping, 2.11 Paving, and 2.12 Utilities.