Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roof replacement includes, Replacement of the roof and parapet wall caps on the main building, two stairwells, mechanical room, and elevator. Replacement of the shingled roof and guttering on the auditorium. Replacement of the shingled roof on the shed building. Replacement of the guttering on the gymnasium. Replacement of the parapet wall cap, vents, and fans on the cafeteria building. Silicon coating of the roofs of the two satellite additions of the gymnasium. A structural engineer review of the main building roof trusses as well as the trusses to the two satellite additions of the gymnasium.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of existing concrete roof, installation of a bypass line, and replacement of the MCC panel at the Pump Station; Modifications to the existing roof including: demolition and complete replacement of existing concrete roof with either Aluminum geodesic dome roof or sloped Concrete roof; Replacement of main pump station bypass & intake valve(s); Electrical modifications to the existing pump station include replacement of the existing MCC; Modifications of the existing site also include replacement and relocation of security fence and chlorination building repairs.
Posted Date
Dec 6, 2025
Due Date
Jan 7, 2026
Release: Dec 6, 2025
Close: Jan 7, 2026
Replacement of existing concrete roof, installation of a bypass line, and replacement of the MCC panel at the Pump Station; Modifications to the existing roof including: demolition and complete replacement of existing concrete roof with either Aluminum geodesic dome roof or sloped Concrete roof; Replacement of main pump station bypass & intake valve(s); Electrical modifications to the existing pump station include replacement of the existing MCC; Modifications of the existing site also include replacement and relocation of security fence and chlorination building repairs.
AvailableRoof Replacement at High School.
Posted Date
Dec 14, 2025
Due Date
Jan 21, 2026
Release: Dec 14, 2025
Close: Jan 21, 2026
Roof Replacement at High School.
AvailableWork includes roof top unit (rtu) replacement.
Posted Date
Dec 12, 2025
Due Date
Dec 29, 2025
Release: Dec 12, 2025
Close: Dec 29, 2025
Work includes roof top unit (rtu) replacement.
AvailableSeeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
Posted Date
Dec 7, 2025
Due Date
Dec 29, 2025
Release: Dec 7, 2025
Close: Dec 29, 2025
Seeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis