Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking separate turnkey design and cost proposal for the boiler replacement epdm roof building automation systems - ddc controls replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Remove the existing roofing system and install a new, fully warranted roofing system at the building. Remove and properly dispose of existing roofing materials. Install new roofing system (specify type: e.g., TPO, EPDM, metal, etc.). Include insulation, flashing, drainage systems, and sealants.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
Remove the existing roofing system and install a new, fully warranted roofing system at the building. Remove and properly dispose of existing roofing materials. Install new roofing system (specify type: e.g., TPO, EPDM, metal, etc.). Include insulation, flashing, drainage systems, and sealants.
Premium
Access the largest public sector contact database
Re-Roof replacement.
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
Close: Dec 15, 2025
Re-Roof replacement.
AvailableThe project consists of the removal of approximately 6,038 Sq. Ft. Total; 3,490 Sq. Ft. (Upper roof) 2,548 Sq. Ft. (Lower Roof) and is comprised of Ballasted EPDM Roofing membrane, tapered insulation on 2” Polyisocyanurate, and vapor retarder. Roof replacement to be fully adhered EPDM membrane roofing with layers of rigid insulation, tapered insulation, and vapor barrier, metal trim, reglets, and copings, along with cleaning and sealing of the existing joints in masonry and concrete copings, along with Mechanical, Electrical, and Plumbing work as indicated on the drawings.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
The project consists of the removal of approximately 6,038 Sq. Ft. Total; 3,490 Sq. Ft. (Upper roof) 2,548 Sq. Ft. (Lower Roof) and is comprised of Ballasted EPDM Roofing membrane, tapered insulation on 2” Polyisocyanurate, and vapor retarder. Roof replacement to be fully adhered EPDM membrane roofing with layers of rigid insulation, tapered insulation, and vapor barrier, metal trim, reglets, and copings, along with cleaning and sealing of the existing joints in masonry and concrete copings, along with Mechanical, Electrical, and Plumbing work as indicated on the drawings.
AvailableProcurement of services for the replacement of approximately 18,500 square feet of EPDM roof with a new 60 mil PVC watertight roof system and building envelope masonry repairs.
Posted Date
-
Due Date
Jan 8, 2026
Close: Jan 8, 2026
Procurement of services for the replacement of approximately 18,500 square feet of EPDM roof with a new 60 mil PVC watertight roof system and building envelope masonry repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis