Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx; replacement of the entire roof with a new fully welded, steel roof structure; cleaning, sandblasting, and painting all interior and exterior surfaces. Full containment is mandatory; miscellaneous structure modifications and surface repairs; reconditioning the roof aeration unit. The Reservoir is currently out-of-service. Roof replacement to start as soon as possible after anticipated Council award on September 2, 2025. Blasting and painting the Reservoir shall be performed in late summer/fall of 2026. Anticipated start date for blasting and painting is September 8, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes the following work on the 1,000,000-gallon hydropillar style North Tower constructed in 1987 by PDM. The date of last reconditioning was in 2004 when Champion Coatings fully replaced the interior wet and exterior coatings and spot repaired the interior dry area coating.
Posted Date
Dec 17, 2025
Due Date
Jan 14, 2026
Release: Dec 17, 2025
Close: Jan 14, 2026
The project includes the following work on the 1,000,000-gallon hydropillar style North Tower constructed in 1987 by PDM. The date of last reconditioning was in 2004 when Champion Coatings fully replaced the interior wet and exterior coatings and spot repaired the interior dry area coating.
AvailableProvide services for 500 Gal. above ground septic tank pumping/cleaning.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Provide services for 500 Gal. above ground septic tank pumping/cleaning.
Available2026 water tank sandblasting and painting-arrowhead 1,000,000 gallon ground tank.
Posted Date
Dec 20, 2025
Due Date
Jan 29, 2026
Release: Dec 20, 2025
Close: Jan 29, 2026
2026 water tank sandblasting and painting-arrowhead 1,000,000 gallon ground tank.
AvailableThe project includes the surface preparation and painting of a 1.0-million-gallon elevated storage tank’s interior and exterior. The tank to be painted is a toro-spherical steel bowl supported by steel legs. Additionally, the project includes the replacement of the cathodic protection system and other minor electrical work.
Posted Date
Nov 20, 2025
Due Date
Jan 15, 2026
Release: Nov 20, 2025
Close: Jan 15, 2026
The project includes the surface preparation and painting of a 1.0-million-gallon elevated storage tank’s interior and exterior. The tank to be painted is a toro-spherical steel bowl supported by steel legs. Additionally, the project includes the replacement of the cathodic protection system and other minor electrical work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis